Complementary and modified design and process variables and quality control that appear simultaneously in the pre-production phase.
Leading design solution to effectively support early settling of mass production quality while reducing overall mold development lead time
Wetting test
- core dislocation
Operation check
- operation part stroke check
Interference test
- Interference of cooling components
Assembly inspection
- Pocket Missing and Error
Assembly inspection
- Pocket Missing and Error
Revision Inspection
- Missing Modifications
interval check
- Cooling parts gap reduction
Post-Operation Inspection
- post-operating interference
After the introduction of G-DFM
Reduced defect rate by 80% on average
After the introduction of G-DFM
Reduce verification time by 70%
After the introduction of G-DFM
Reduce document creation by 70%
After the introduction of G-DFM
Decrease design time by 60%